← All work
Hunter College Casework · Manhattan, NY
Casework for a CUNY college
Casework for rooms at a CUNY college, built from DKT's own field measurements and shop drawings.
- Client
- Hunter College, City University of New York
- Location
- Manhattan, NY
- Sector
- Public & Institutional
- Completed
- September 2026
The project
New casework had to fit existing rooms where the rough plumbing and an existing beam did not match the original layout.
Our work
Millwork package: field measurement, shop drawings, fabrication and installation of wall and base cabinets with solid-surface countertops and sinks. DKT field-measured the rooms on July 22, 2026 and issued shop drawings two days later, with the layout revised to suit actual conditions: cabinet sizes and countertop configuration changed to accommodate the plumbing location and the beam.
Installed by September 2026.
- Field measurement
- Shop drawings
- Wall and base cabinets
- Solid-surface countertops
- Plastic laminate fronts
- Installation