Casework for a CUNY college

Casework for rooms at a CUNY college, built from DKT's own field measurements and shop drawings.

Client
Hunter College, City University of New York
Location
Manhattan, NY
Sector
Public & Institutional
Completed
September 2026
Hunter College Casework, photo 1 of 4

The project

New casework had to fit existing rooms where the rough plumbing and an existing beam did not match the original layout.

Our work

Millwork package: field measurement, shop drawings, fabrication and installation of wall and base cabinets with solid-surface countertops and sinks. DKT field-measured the rooms on July 22, 2026 and issued shop drawings two days later, with the layout revised to suit actual conditions: cabinet sizes and countertop configuration changed to accommodate the plumbing location and the beam.

Installed by September 2026.

  • Field measurement
  • Shop drawings
  • Wall and base cabinets
  • Solid-surface countertops
  • Plastic laminate fronts
  • Installation
Hunter College Casework, photo 2 of 4Hunter College Casework, photo 3 of 4Hunter College Casework, photo 4 of 4

Photography and drawings: DKT project record, July to September 2026.